101 Best Lists

Etap Plot Manager Apr 2026

Announced in 2013, the 101 Best Written TV Series list honors seven decades of outstanding television writing and the writers who brought it all to life.
101 Best Written TV Series List

Etap Plot Manager Apr 2026

| Tier | Component | Example | Persistence | |------|-----------|---------|--------------| | | Project / Study Case | "MyPlant_BaseCase", "MyPlant_2025_Expansion" | Saved in .etap project | | 2 | Plot Definition | "Gen1_Rotor_Speed_During_Fault" | Saved as XML inside the project | | 3 | Result Snapshot | The actual time-series array from a simulation run | Stored in .rps (results) files |

Crucial insight: If you delete the result file but keep the plot definition, Plot Manager shows an empty graph with a "Missing Data" overlay—it does not crash. You can later re-link to a new .rps file. etap plot manager

Instead of the basic "run → view plot" cycle, a deep user does this: | Tier | Component | Example | Persistence

# Access Plot Manager via ETAP COM plotMgr = project.PlotManager plot = plotMgr.GetPlot("Gen1_Rotor_Speed") plot.ResultFile = "C:\Results\FaultStudy.rps" plot.YAxisVariable = "Speed (pu)" plot.XAxisStart = 0.0 plot.XAxisEnd = 2.0 plot.Refresh() plot.ExportAsImage("Gen1_Speed.png", width=1920, height=1080) This allows integration with automated report generation pipelines (e.g., run 50 fault scenarios overnight, Plot Manager generates 150 standardized plots, a script inserts them into a Word report). run 50 fault scenarios overnight